Thank you David for posting this document! This responds to the community request we heard at the last RCW (and elsewhere) to have a transparent documentation of what is needed for a synergistic DESI - Rubin survey on the Rubin survey strategy side as well as on what is on the table for the Rubin community to maximise Rubin science with spectroscopic programs if this synergistic program happens. I encourage not only the SCOC, which is of course already looking closely at this, but all community members to review this document carefully thinking of how the survey strategy changes may affect their science and of how they may use the spectrocopic resources to support their science.

The survey strategy team is preparing simulations of these (and other) options so please keep an eye out on the Science > Survey Strategy topic for a release of opsims (lsst observing strategy simulations) and associated MAF evaluations (evaluation of science metric outcomes of these sims).

The opsims will be posted on community as usual, but we will also add a link to this and other relevant threads

2 Likes

Thanks for posting this document!

I want to point out that the ~1% figure for the perturbation is not accurate or at least not useful in terms of thinking about the request. In version 5.3 of the survey per the SCOC slides ( SCOC-workshop#6-day2 - Google Slides ), the survey takes a median of ~45 visits in u over ~22k deg^2. The required visits from DESI are roughly 30 in 5000 deg^2. Given that no part of the survey reaches the required number before year ~7, and the data is needed earlier, this amounts to perturbation effecting (30 * 5000) / (45 * 22000) ~ 15% of all u band visits.

That is a huge perturbation on the survey and is why in more or less all scenarios that have been simulated so far, it is difficult to reach the u band depth without a big effect in the survey (like not taking u band data for a few years in the DESI region).

1 Like

A note for those who may be paying attention to this proposal but are less familiar with the SCOC process.
The SCOC is a committee that makes recommendation of the survey strategy to the Observatory Director, who is ultimately responsible for deciding its implementation

Our recommendations are informed by community feedback as well as the expertise of the committee members themselves, and we base our inference both on quantitative science metrics within the Metric Analysis Framework and less quantifiable insight through realizations of the LSST obtained as OpSims

The SCOC will complete its recommendation on the DESI proposal by the end of 2026. To arrive at our recommendation, we will consider the synergistic scientific benefits of modifying the survey strategy itself, weighted against potential scientific losses, as well as the scientific throughput of the offered follow up.
Thus, we welcome feedback from the community on both the survey impacts and options for and considerations on the usage of DESI follow up resources.

We expect to release relevant OpSims no later than 11/15 (via a community post) and we will ask community feedback to be delivered to the SCOC by 12/10 to enable a recommendation finalization by 12/31. Keep an eye here, we will link the OpSim community post. While discussions on this community thread are welcome, we recommend feedback is aggregated by Science Collaboration for ease of coordination, as was done on previous topics.

We suggest the Science Collaborations and other respondents provide feedback to the SCOC addressing specifically 6 points:

  1. scientific benefits of the survey strategy implementations including DESI (based on MAF)
  2. scientific benefits of the survey strategy implementations including DESI (expected but not measurable with MAF)
  3. negative scientific impacts of the survey strategy implementations including DESI (based on MAF)
  4. negative scientific impacts of the survey strategy implementations including DESI (expected but not measurable with MAF)
  5. scientific benefits of DESI follow-up resources as outlined in the DESI document in this thread
  6. scientific benefits of DESI follow-up resources obtained with modifications of the initial proposal outlined in the DESI document in this thread
1 Like

I want to highlight that the impacts of DESI request and the revised footprint are intertwined for Solar System because the WFD ecliptic is impacted in each of those scenarios. The SSSC has already raised this interconnectedness. Are the revised footprint proposal going to be out by 11/15 as well?

1 Like

Additional simulations, including revised footprint proposals are also going to be released right after the footprint task force report is made public describing those proposals and their motivation. This all should happen this week or early next.

I’ll add that one of the DESI areas requested for coverage does not currently fall in the Rubin footprint. We literally cannot consider one without the other.