# DM Monthly Status Report for 03 2025

**URL:** <https://www.rubin.community/t/dm-monthly-status-report-for-03-2025/10009>\
**Category:** Data Management\
**Created:** [April 21, 2025, 8:29pm UTC](https://www.rubin.community/t/dm-monthly-status-report-for-03-2025/10009 "2025-04-21T20:29:24Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![kervan](https://avatars.discourse-cdn.com/v4/letter/k/d6d6ee/32.png) [@kervan](https://www.rubin.community/u/kervan)\
**Post date:** [April 21, 2025, 8:29pm UTC](https://www.rubin.community/t/dm-monthly-status-report-for-03-2025/10009/1 "2025-04-21T20:29:25Z")

</div>

The DM monthly status report covering March activities has been posted to DocuShare, collection-16257. For convenience, the High-level Summary is pasted below. Direct link to the full report: [DocuShare Authorization Error](https://docushare.lsstcorp.org/docushare/dsweb/Get/Document-60449/DM%20Monthly%20Progress%20Report%20-%20202503.pdf)

High-level Summary  
Community Interactions, Meetings and Workshops  
In a joint initiative between the Operations and Construction projects, we hosted a Joint Technical Meeting focused on finalizing preparations for Data Preview 1 (DP1) and the upcoming LSSTCam on-sky commissioning period. We reviewed initial DP1 data products, discussed data quality and pipeline performance, and identified issues from OR5 to address before LSSTCam-scale processing begins.  
Technical Progress  
Rubin Science Platform notebook aspect scaled and tested to 3,000 users, this is an important demonstration on the way to Data Release readiness.

Major progress on P1a verification at the JTM - about 55% formally verified with plans to complete the remaining before CCR2.

Transfer of files to an Independent Data Access Center via Rucio was demonstrated.

The Solar System object consolidation tasks for DP1 were written and DP1 production was wrapping up in March.  
Sasquatch and ap\_verify were configured to upload CI metrics from analysis\_tools to Chronograf. An APDB containing long-term simulated LSSTCam observations for PPDB replication testing was created.  
Pipelines were prepared for LSSTCam, including deploying preliminary LSSTCam calibration frames to the summit. Synthetic source injection was integrated into the biweekly HSC RC2 pipeline, allowing the retirement of the biweekly reprocessing of simulated LSSTCam-imSim data once on-sky operations begin.

Main Telescope Header Service updated in advance of LSSTCam going on sky.
